0 Items In Bag
Subtotal 0.00
Regular Price: $11.99
You Save: $1.20 (10%)
$10.79
Size 9 ft
Color Black
Quantity 1 2
This item not eligible for additional promotional discounts.
Shires Extra Long Lead Rope
Shires Extra Long Lead Rope is ideal for loading or leading.
Comfortable in the hand, this extra Long leadrope features a practical swivel trigger clip for easy fastening. 9 Ft
Overall Rating: 0 of 5 Stars
There are 0 reviews for this product
Shires Extra Long Lead Rope
Shires Extra Long Lead Rope is ideal for loading or leading.
Comfortable in the hand, this extra Long leadrope features a practical swivel trigger clip for easy fastening. 9 Ft